Hello SAP friends,

In my client I have the following scenario:

I have a steel board to be cutted in little pieces and I want to control the consumption of the steel board and the goods issue of the little pieces!

I am working in a solution but I have some doughts!

What I have designed in SAP so far is:

Materials:

- Steel Board - Raw Material

- Piece A - Semi Finished Material

- Piece B - Semi Finished Material

- Cut Plan - Phantom Material

BOM:

Cut Plan

- Steel Board 1 UN

- Piece A -4 UN

- Piece B -3 UN

Routing:

Cut Plan

- 10 Cut Piece A 1 Hour Machine Time > Material Assigment (Steel Board, Piece A)

- 20 Cut Piece A 2 Hour Machine Time > Material Assigment (Piece B)

What I am saying is: With a steel board I can produce 4 piece A and 3 piece B but I have to use 1 steel board!!! The material Cut Plan doesn't exists, I only need it to create the production order...

I think this will work! My only concern is, how does the cost works? The materials Piece A and Piece B have a price, but when I do a goods issue from production order, I want the price o these materials to be is price plus the cost of the machine time of the operation on the routing! Is this possible, how?

I am sorry for the bad English.

Thanks in advance,

Adelmo Silva

Edited by: Adelmo Silva on Sep 1, 2008 3:44 PM