Skip to Content

Archived discussions are read-only. Learn more about SAP Q&A

Manual lot

dear all

i want to create a manual lot.how can i assign an inspection plan to that lot other than that plan which automatically assigns when lot is created automatically.i mean i want to assign a plan which i wish.so is it possible or it will pick the same plan whose usage is linked to that lot origin(insp. type)

Former Member
Former Member replied

Hi Ahmad,

Run trx QA02.

Enter the lot number.

in the inspection specification tab

click on the task list/ sepc. button

then on the sample button in the Sample Tab.

Then save.

if the task list will be there in the system for the material the lot will get released.

Regards,

Shyamal

0 View this answer in context
Not what you were looking for? View more on this topic or Ask a question