Hi,
I have a PPDS PPM that was created by CIF. The original BOM is not valid. I want to change the valid to date in APO manually. Can I do that or does it have to be CIFed? I see the field grayed out in edit mode.
Thanks.
you cannot change the vaidity date for the PPM manually. System automatically takes the date that has entered in the PPM plan (which is a combination of BOM +Routing).