cancel
Showing results for 
Search instead for 
Did you mean: 

Scheduling Jobs in PI

Former Member
0 Kudos

Hi,

1 .Can we schedule the jobs in PI ?

2. kindly tell me how to schedule the jobs ?

3. How cancel the Scheduled jobs also...

Accepted Solutions (1)

Accepted Solutions (1)

hemant_chahal
Contributor
0 Kudos

Hi,

you can achieve this, refer the blog

thanks

hemant

Answers (7)

Answers (7)

Former Member
0 Kudos

good

former_member182455
Active Contributor
0 Kudos

Hi,

check this links

Please have a look at

and note 16083

regards

vasu

Former Member
0 Kudos

Hi,

Schedule the Proxy Report in R/3 itself to Trigger data to XI

http://help.sap.com/saphelp_nw04/helpdata/en/ef/2c513897110872e10000009b38f889/frameset.htm

REgards

Seshagiri

Former Member
0 Kudos

hi,

Do u mean to schedule the report that triggers the proxy to run at specific timings then an abaper can surely help you out by Scheduling the Back ground job in SM36 and jobmonitoring in SM37

Thanks,

Durga.

Former Member
0 Kudos

>>>1 .Can we schedule the jobs in PI ?

2. kindly tell me how to schedule the jobs ?

3. How cancel the Scheduled jobs also...

BPM does it all....

Former Member
0 Kudos

Hi,

When i use proxies to communicate between SAP ECC 6.0 and PI 7.0 system.

How will i schedule the jobs to send the data from SAP ECC to PI 7.0 .

Kindly tell me how to acheive it .

Former Member
0 Kudos

HI,

U can schedule the dapter channel in different way. wat is ur exact requirement.

If u want to schedule the channel at particular time then u can do it.

refer the below link:

Sceduling channel isfrom SP19

SAP Network Blog: Control Communication Channels Externally without using RWB

SAP Network Blog: Starting / Stopping of Communication Channel from RWB

chirag