on 08-26-2008 2:36 PM
Dear Gurus:
We have an Extended Classic setup & the confirmation for the products normally carried out from the SRM side. Our setup is such that the confirmations created in SRM & the corresponding Material Document number generated from the backend R/3 are different. My question now would be is there any way to locate the SRM confirmation number from the R/3 side??
Hi. You could use the BBP_DOC_CHANGE_BADI to write the SRM confirmation number to the GR slip (ES_HEADER-GR_GI_SLIP_NO) or bill of lading ES_HEADER-BILL_OF_LADING).
Then you would have the SRM confirmation number in R/3 / ECC.
Regards,
Dave.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
The confirmation no in SRM and material no in ECC will be necessarily different.
since these are two diff docs in two diff systems.
the confirmation created in SRM is carried in IDOC MBGMCR and posted in ECC MM PO
which creates material document and updates PO history.
had worked on it long back.
some 2 fields in SRM conf are linked to ECC GR
BR
Dinesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Can you explain me the requirement clearly.
After confirmation in SRM initially you will get one confirmation number that will create a material document in backend. In R/3 we cannot find the SRM number, but the R/3 confirmation number will be updated to SRM -- confirmations -- Display confirm/process confirmations.
Thanks & Regards,
Krish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.