Mass Change for Inspection set-UP

Former Member
0 Kudos

Hi Qm Gurus,

Is it 100% sure that we could make the inspection set-up like for instance for 20,000 raw materials through QA08 (Mass Change of Inspection Set-UP) as long as Quality Managemnt tab is maintained in Material Master through LSMw??

Because LSMW is difficult in maintaining the inspection types of materials.Thus, I use QA08 instead. BUT is this a very full-proof to be used 100 %??

Thanks

Matildo, Edsel

QM Consultant

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello Matildo,

As you said if the QM view is extended the QA08 100% full proof.

Don't have any doubts in your mind. And you can randomly check few of them. According to it is more proof full then LSMW.

Best Of luck

Regards,

Shyamal