cancel
Showing results for 
Search instead for 
Did you mean: 

K-Factor in Sampling Proecdure

Former Member
0 Kudos

What is meant by K-Factor in Sampling Scheme for Variable Inspection by S-method. How does it affect in calculating the sammple size.

Regards

Ashwin

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

[http://help.sap.com/erp2005_ehp_03/helpdata/EN/2d/350d1d448c11d189420000e829fbbd/frameset.htm]

Above help may help you.

Actuly the K-Factor relates with "A variable inspection"

variable inspection:

An acceptance sampling inspection that determines whether the inspection lot is accepted, by using the actual values determined for a quantitative characteristic in the samples.

[The SPC Calculation with K-Factor|http://help.sap.com/erp2005_ehp_03/helpdata/EN/18/438af4449011d189420000e829fbbd/frameset.htm]

Regards,

Shyamal

Former Member
0 Kudos

I dinn got what you exactly wnat to say...do you mean to say that if lot size is 0-100 and sample size is 5 nad if we put K-factor as 1, then even if 1 piece is rejected the valuation will be rejected..

pelase clarify

Regards

Ashwin